Club House Construction Pictures

Geothermal tubing in trench (6' deep)

Geothermal Tube trenches (2 @ 900' long by 6' wide)

Footings for building

underslab prep for plumbing

What a mess! Getting ready to pour slab

Underslab kitchen and bath areas

Electrical runs under slab

Under slab backfilled after plumbing and electrical

Cistern for water system

More compacting to get ready for slab

Well head connections

Pouring main slab (90 yards of concrete)

Slab almost finished

Slab finishing underway

Slab under cover and waiting for curing

Slab after curing

Slab uncovered and ready for next step

Bath and kitchen end of slab

Drain field for septic

Septic holding/processing tank

First, column sections are erected for roof

Wall sections are added next

Add top wall sections when needed (gable ends)

Starting to look like a building now

Storage end

Exterior Wall Texturing (9" walls)

Trap Field (North) Side View of Bldg

West Building end (Storage side)

Front Patio

Parking Lot Side of Bldg

View of Patio and Retaining Wall (North side)

Building East Side

Building North Side

Building South Side

Clubhouse Sitting Area

East Side RV parking

BTC Entrance Gate off Hwy 20

Geothermal HVAC system

Irrigation system Installation

Kitchen (pardon the mess...)

11kw Solar installation

Trap Fields looking west

West Side RV Parking

Finished Patio Cable Railing

Grass is filling in...